Second Storey Addition in Tweed
With very careful planning, this second storey addition was opened, framed and closed in within four days.
Day 1: the roofing materials and trusses were removed; the walls (pre-constructed on the ground) were lifted and secured in place and; the trusses were lifted into place onto the walls
Day 2: the roof trusses and sheathing was installed
Day 3 and 4: the steel roofing was installed